Home
/ Projects
/ + Railways
/ ERGA OSE S.A.
CASE STUDY PROJECTS
ERGA OSE S.A.
Completion of infrastructure designs of the new railway line of normal width between Korinthos – Patra at the section from km 113,6 to km 126,4 (Drepano Railway Station – St. Dionysios Railway Station) (Contr. No. 445)
AWARDING AUTHORITY/CLIENT
Greek Railways Projects Organization (ERGA OSE S.A.)
DESIGN DISCIPLINES
- Geotechnical Investigations, Field Testing and Laboratory Testing
- Geotechnical Designs (Bridge Foundations, Cut & Covers, Stations, Embankments, Cuts)
- Hydrogeological Investigation and Design
- Structural Designs (Bridges, Retaining Walls)
CONSTRUCTION COST 0,5 billion €
CONSULTING FEE 0,8 m €
PROJECT DURATION 2006 – 2011