IONIA MOTORWAY
Completion of the Geotechnical, Geological and Tunnel Design works for the project “Design and Construction of the IONIA ODOS Motorway from Antirio to Ioannina, PATHE Motorway Athens (Metamorfosi I/C) – Maliakos (Skarfia) and PATHE connecting branch from Schimatari to Chalkida
AWARDING AUTHORITY/CLIENT
TERNA S.A. / FERROVIAL AGROMAN S.A. / DRAGADOS S.A.
DESIGN DISCIPLINES
- Geological and Seismic Designs
- Geotechnical Investigations, Field Testing and Laboratory Testing
- Geotechnical Designs (Bridge Foundation, Tunnel Primary Support, Earthworks)
- Structural Designs (Tunnel Final Lining)
- Monitoring
CONSTRUCTION COST 1,3 billion €
CONSULTING FEE 2,1 m €
PROJECT DURATION 2007 – 2011