IONIA MOTORWAY

+ Motorways

Home / + Motorways / IONIA MOTORWAY

IONIA MOTORWAY
Completion of the Geotechnical, Geological and Tunnel Design works for the project “Design and Construction of the IONIA ODOS Motorway from Antirio to Ioannina, PATHE Motorway Athens (Metamorfosi I/C) – Maliakos (Skarfia) and PATHE connecting branch from Schimatari to Chalkida

AWARDING AUTHORITY/CLIENT
TERNA S.A. / FERROVIAL AGROMAN S.A. / DRAGADOS S.A.

DESIGN DISCIPLINES
- Geological and Seismic Designs
- Geotechnical Investigations, Field Testing and Laboratory Testing
- Geotechnical Designs (Bridge Foundation, Tunnel Primary Support, Earthworks)
- Structural Designs (Tunnel Final Lining)
- Monitoring

CONSTRUCTION COST 1,3 billion €

CONSULTING FEE 2,1 m €

PROJECT DURATION 2007 – 2011